- Lenders may lend against the as-is value, the after-repair value, or a blend, and the choice changes how much cash you need.
- Holding costs, interest, taxes, insurance, utilities and extension fees, keep running until the property sells and the loan is repaid.
- A sale that slips past the loan's maturity can trigger extension fees on top of extra months of interest.
- Budget conservatively for renovation, time on market and selling costs, and have a fallback if the sale takes longer.
How is flip financing put together?
A fix-and-flip loan usually has two jobs: helping to fund the purchase, and helping to fund the renovation. Lenders approach that in different ways. Some advance a portion of the purchase price at closing and release renovation funds in stages as work is completed and inspected, much like a small construction loan. Others lend only against the property as it stands and expect the borrower to pay for the renovation from their own cash.
Ask early which approach applies, because it changes how much equity you need going in. If renovation funds are released in draws, also ask how long a draw takes and what inspection or legal costs come with each one. Delays in releasing funds can hold up trades and add weeks to the timeline.
Which value does the lender use: as-is or after-repair?
The as-is value is what the property is worth today, in its current condition. The after-repair value, often shortened to ARV, is the appraiser's estimate of what it will be worth once the planned work is done. The gap between the two is the reason the project exists.
Private lenders set their own limits. Some cap the loan as a percentage of the as-is value, some as a percentage of the after-repair value, and some use both and lend the lower of the two. A lender comfortable with after-repair value may want a detailed scope of work, contractor quotes, and evidence that comparable renovated homes have sold at the projected price. Loan-to-value in private lending explains how these ratios work.
Treat any after-repair value as an estimate, not a promise. If the market softens or the finished product does not match the comparables, the sale price may come in below projections, and the profit can shrink faster than expected.
What holding costs run until the property sells?
Holding costs are everything you pay while you own the property and it is not producing income. They are easy to underestimate because each one looks small on its own.
- Monthly interest on the private loan, often interest-only.
- Property tax, insurance (including coverage suitable for a vacant property under renovation) and utilities.
- Condo or strata fees, if applicable.
- Extension or renewal fees if the project runs past the loan's maturity.
- Lender and broker fees, legal and appraisal costs at the start, and discharge costs at the end.
- Selling costs such as real estate commission, legal fees and any staging.
What does a late sale really cost?
The worked example uses the bridge exit planner on a $340,000 private loan for a Quebec project with a nine-month term. The plan assumes the sale closes in month 10, one month past maturity, triggering a three-month extension at a 1% fee.
The total cost to exit comes to $44,483, including $32,583 of interest over ten months, $8,500 in up-front fees and a $3,400 extension fee. Once the term has passed, each additional month costs about $4,392 when the extension fee is spread across its term. After 5% selling costs and repaying the loan, a $560,000 sale leaves $192,000, but that figure is before the interest and fees already paid, the renovation budget, and the cash the investor put in at purchase.
Those numbers make a simple point: time is the variable most likely to hurt. A three-month delay in permits or trades, or a slower sale than expected, flows straight to the bottom line. Selling as an exit and when your exit runs late are worth reading before you buy.
What if the sale doesn't happen as planned?
A good flip plan includes a second exit. If the property does not sell at the target price, could it be rented and refinanced with a longer-term lender instead? In the example, the loan is 60.7% of the after-repair value, which would fit under an 80% conventional limit if the property appraised at that level and the borrower qualified. That kind of fallback only works if the numbers and the borrower's income support it, so check it with a mortgage professional before you buy.
If neither exit is ready at maturity, the lender may offer an extension, likely with a fee and possibly a higher rate. Renewal and extension fees explains how to evaluate that offer.
What should you check before committing to a project?
Build the budget from the bottom up: purchase price, closing costs (see closing costs: legal and appraisal), renovation quotes plus a contingency, holding costs for a realistic timeline with a margin, and selling costs. Run the financing through the true cost calculator and the exit planner using a sale date later than you hope.
Check permits, zoning and any heritage or condo restrictions before you buy. In Quebec, where this security is called a hypothec, ask a notary or lawyer to explain the terms. Elsewhere, have a lawyer review the commitment and mortgage. The Quebec province page has more local context.
What questions should you settle on a flip offer?
On a flip, the loan terms decide whether a slow sale is an inconvenience or a loss. Ask how renovation funds are released (all at closing or in draws after inspections), whether interest is charged on undrawn funds, what minimum-interest period applies if you sell early, and what the extension fee and rate are if the sale takes longer than the term.
Check the APR on the cash actually advanced in the commitment analyzer: a six-month loan with heavy upfront fees and a minimum-interest clause can come closer to the 35% criminal-rate limit than the contract rate suggests. Then budget the late case, with three to six extra months of carrying costs, before you make an offer on the property.
A $280,000 loan at 12.99% for six months on a $400,000 purchase, with six months' interest owed even on an early sale.
| Loan | $280,000 first mortgage6-month term, interest-only |
|---|---|
| Rate | 12.99%compounded monthly |
| Fees | $14,200lender 3%, broker 1%, other $3,000, deducted from the advance |
| Property | $400,000loan-to-value 70.0% |
| Clauses | 6 months' minimum interest |
| Credit actually advanced | $265,800loan minus every deducted charge |
| APR on credit advanced | 23.85%Criminal Code s.347 limit: 35% |
| If repaid at month 3 | 47.39%fees spread over fewer months |
| All-in effective annual cost | 26.64% |
| Cost of the term | $32,386interest plus fees; $280,000 still owed at maturity |
| Analyzer verdict | Get it reviewed3 points to raise |
- serious If repaid early, the APR could pass 35% (47.4% at month 3)
- Check Minimum interest of 6 months if you repay early
- Check Fees add 12.8% a year on top of the rate
Open this example in the commitment analyzer →Computed by this site's commitment analyzer (Criminal Code s.347, Interest Act ss.6, 8, 10). Illustrative terms, not an offer.
What does this mean for you?
- Price the late sale: add three to six months of carry and an extension fee to your budget before you buy.
- Check the APR on the cash advanced; short flip loans with heavy fees can approach the 35% limit.
- Line up the selling costs (commission, legal, staging) in the exit planner.
What do people ask most?
Do private lenders finance renovation costs on a flip?
Some do, for example by releasing renovation funds in stages after inspections, while others lend only on the purchase. Ask how renovation funding works before you make an offer on a property.
What is after-repair value?
It is an appraiser's estimate of what a property will be worth once planned renovations are complete. Lenders may use it, the as-is value, or both when deciding how much to lend.
What are holding costs on a flip?
They are the costs of owning the property until it sells, including loan interest, property tax, insurance, utilities, condo fees and any extension fees.
What happens if my flip does not sell before the private loan matures?
You may need an extension, which can carry a fee and higher rate, or a refinance with another lender. Plan a fallback before you buy and raise any delay with the lender early.